-
Price:
$482,500 USD -
Location:
Fargo, North Dakota - (800) 437-2924
Interested in this machine? Send us a message
PriceWatch
Subscribe to be notified of price changes on this item.
2024 Other Washing Equipment 7203WS
Fields with asterisks * are required.
Print This Page
Description
7203 WASH SCREEN
Inventory ID
E00067938
Serial
7-20-3-W-423-24
Machine Location
Details
- Inventory ID: E00067938
- Status: On Yard
- Make: Other
- Model: 7203WS
- Year: 2024
- Serial#: 7-20-3-W-423-24
Notes
- PORTABLE 7›¼À™ X 20›¼À™ - 3 DECK SCREEN HI-BOY WASH PLANT WITH FLUME AND WITHOUT SANDSCREW EQUIPPED PER THE THE BELOW:
- SLURRY BOX WITH 3 WATER OUTLETS INCLUDING FOLD-DOWN SUPPORT STAND:
5 INETS ON SLURRY BOX WITH 3 WATER BARS WITH SEPARATE VALVES FOR EACH OUTLET AND SEPARATE MANIFOLD:
HYDRAULIC FOLD ON SLURRY BOX: - CEDARAPIDS TSV7203-38 - 7›¼À™ X 20›¼À™ - 3 DECK SCREEN:
- - 50 HP 1200 RPM TEFC SCREEN MOTOR.
- HUCK BOLTED SCREEN BOX.
- ADJUSTABLE OVAL STROKE ANGLE STROKE LENGTH AND SPEED.
- SELF ALIGNING SPHERICAL BEARINGS.
- SPLASH TYPE LUBRICATION SYSTEM.
- COIL SPRINGS 4FT PANELS SIDE TENSIONED BOTTOM DECK 0 DEGREE INCLINE LH
DRIVE.
- FABTEC BASEFRAME - TANDEM AXLE CARRIER:
- - 18" WF BEAM 50#.
- HUTCH 54 1/2" SPAN EQUALIZING SUSPENSION.
- 22 500# STANDARD FORGE AXLES 11:00R X 22.5 TIRES.
- AIR BRAKES LED BRAKE LIGHTS LED MARKER LIGHTS LED STROBE LIGHT REFLECTIVE
TAPE AND MUD FLAPS.
- CARRIER DESIGNED TO ACCOMMODATE SLURRY TANK/ SAND SCREW.
- 50 HP 1200 RPM TEFC TOSHIBA SCREEN MOTOR. - 15 BAR WASH SYSTEM:
- - FULL LENGTH MANIFOLD WITH INLET PIPE AND FLANGE.
- INDIVIDUAL BRASS GATE VALVES.
- SPRAY BAR SEALING BOOTS.
- SH. #40 1 1/2" SPRAY BARS WITH BRASS "VEE JET" NOZZLES.
- FRESH WATER FLUSH SYSTEM. - 1/4" PL UNDER SCREEN COLLECTION WITH 14" DISCHARGE.
- HEAVY DUTY 12" WF SUPPORT STAND UNDER SCREEN.
- HEAVY DUTY ROLL-OUT CHUTES FOR MAINTENANCE ~VS~ BOLT-ON REMOVABLE CHUTES:
WALKWAYS BOTH SIDES.
AR LINED PRODUCTS DISCHARGE CHUTES WITH EASY ACCESS TO PRODUCT CONVEYORS WITH 1/3-2/3 BLEND PANELS IN PRODUCT CHUTES; 1ST TO 2ND AND FLOP GATE 1/3-2/3 BLENDING FOR 2ND TO 3RD DECK: - 3/8›¼À AR PRODUCT CHUTE LINERS ~VS~ 3/16›¼À AR LINERS:
- 20" FOLD DOWN WALK WAYS BOTH SIDES OF SCREEN 48" BACK PLATFORM TOE BOARDS 42" TUBE STEEL HANDRAILS AND ACCESS LADDER.
- 3RD DECK 24›¼À X 12›¼À™ CROSS CONVEYOR AND 2ND DECK 30›¼À CROSS CONVEYOR:
- - SEW KA77 5 HP RIGHT ANGLE DRIVES TYPE E MAIN BEARINGS
- VULCANIZED LAGGED HEAD PULLEY AND SELF-CLEANING WING TAIL PULLEY.
- DODGE SCM BEARINGS AND 2 PLY 3/16" COVER BELT.
- FULL LENGTH FORMED SKIRT BOARD.
-MOUNTED ON SLIDERS.
- VULCANIZED SPLICES AND SUPERIOR XTERRA WIPERS - BOLT ON FLUME FROM SUBFRAME HOPPER TO DROP INTO SUMP TANK:
- - SUMP TANK PROVIDED BY OTHERS.
- REMOVABLE AND REVERSABLE. - SELF CLOSING SAFETY GATE AT LADDER OPENING.
- SAFETY GUARDS SAND BLASTED CHASSIS RUST INHIBITOR PRIMER AND TWO FINISH COATS OF PAINT INCLUDED.
- BRUTE JACK PLANT MOUNTED 70K RUN-ON SYSTEM:
- - 5" X 36" CYLINDERS 70 000 LB. CAPACITY (AT 2500 PSI) WITH SAFETY-LOK CIRCUIT.
- DELTA HPX-200 12-VOLT POWER UNIT.
- (1) SPOOL VALVE~ NUMBER OF BANKS TO MATCH LEG QUANTITY.
- CYLINDER MOUNTING PLATES & HARDWARE.
- HEAVY DUTY FOOT PADS. - SELF CONTAINED HONDA 8 HP HYD. POWER PACKAGE ~VS~ HPX 200 12V:
- - ELECTRIC START.
- 12 GALLON HYDRAULIC RESERVOIR WITH FILTER PROTECTION.
- 2 1/2 GPM PUMP. - ECOLOGY BLOCK HOLDERS
- SCREEN SAFETY TIE OFF CABLES
- TOOL BOX MOUNTED ON CHASSIS
- SPRAY BARS AT FEED END AND DISCHARGE END OF THE FLUME WITH ADJUSTABLE VALVES
- QTY. (1) LONGER LADDER FOR ADDED HEIGHT
- 12" VERTICAL WALLS ON HOPPER SUBFRAME
- - ELECTRICAL SWITCHGEAR AS DESCRIBED BELOW
- NEMA 4 ENCLOSURE WITH LOCKABLE MAIN BREAKER
- 50 HP FVNR STARTER FOR SCREEN
- (2) 5 HP FVNR STARTERS FOR CROSS CONVEYORS
- (1) 20 HP SPARE STARTERS WITH 60 AMP RECEPTACLES
- 100 AMP FEED BREAKER WITH 100 AMP RECEPTACLE
- BUTTON IN DOOR E-STOP SAFETY START HORN HOUR METER.
- PANEL STAND - GROUND FOR OPS TRANPORTS ONPLANT.
- 100 FT POWER CORD - GUARDING - WE DO NOT WARRANT THAT MANUFACTURERS›¼À™ GUARDING WILL MEET ALL LOCAL CODES. IT IS THE RESPONSIBILITY OF THE END USER TO HAVE GUARDING CHECKED BY A LOCAL INSPECTOR PRIOR TO STARTUP OF EQUIPMENT OPERATIONS CORRECTIVE ACTIONS AND ASSOCIATED EXPENSE ARE THE RESPONSIBILITY OF THE END USER.